Uploaded image for project: 'ASTPP Community'
  1. ASTPP Community
  2. ASTPPCOM-652

Origination costa incorrect

    XMLWordPrintable

    Details

    • Type: Task
    • Status: Done
    • Priority: Medium
    • Resolution: Done
    • Affects Version/s: None
    • Fix Version/s: None
    • Labels:
      None

      Description

      Hi, I have some issues with an incorrect origination cost. For this example I have for the terminating cost for Code 70: Connection cost 0.200 and increment 60 sec and 0.190 for each minute = 0.390 for first minutes and that one if correct. But for Origination cost there is a diff. 

      Connection cost: 0.200, increment 60 sec and 0,590 for each minute = total 0,790 but in the CDR i get 0,800. What am I missing?

      Br Lars

        Attachments

          Activity

            People

            Assignee:
            palak.rami Palak Rami (Inactive)
            Reporter:
            lars@molnstruktur.se Lars Göransson (Inactive)
            Votes:
            0 Vote for this issue
            Watchers:
            2 Start watching this issue

              Dates

              Created:
              Updated:
              Resolved: